Infrastructure

Unfinished pipeline impacts 7 000...

7 months ago - 20 March 2019 | Infrastructure

About 6 932 people and 33 790 large and 18 395 small stock units are facing thirst, as the agriculture ministry battles to finish the...

Infrastructure

Red tape delays housing handover

7 months ago - 18 March 2019 | Infrastructure

Windhoek town planning constraints and red tape, along with a host of other troubles, are to blame for the protracted delays in the handing over...

Infrastructure

DBN pushes affordable homes

7 months ago - 11 March 2019 | Infrastructure

Fast-tracking residential land delivery and affordable housing will not only empower cash-strapped low-income earners and ensure them a stake in the local economy, but lead...

Infrastructure

Hold-up on highways

7 months ago - 11 March 2019 | Infrastructure

Major sections of the Okahandja dual carriageway and the road from Windhoek to Hosea Kutako International Airport are yet to be completed.Works minister John Mutorwa...

Infrastructure

Engineers, builders to pay for...

7 months ago - 01 March 2019 | Infrastructure

The consulting engineering firm and the building contractor Namibia Construction will have to foot the bill for repairs to the Roads Authority’s new N$219 million...

Infrastructure

GIPF pumps millions into housing...

7 months ago - 28 February 2019 | Infrastructure

The Government Institutions Pension Fund (GIPF) has invested N$17.4 million in housing aimed at low- and medium- income groups at Eenhana in the Ohangwena region.According...

Load More